Home

For Ops owners

Ops Training

The training helps the teams that enable Product Builders make their shared services usable.

Format and price

From €4,500 excl. VAT per group

  • Two days (14 hours), in English or French, up to eight participants
  • Includes a 60–90 minute preparation call and a 90-minute follow-up two to three weeks later

Book a training

or write to lcnlechevaliernoir@gmail.com

Who it is for

Design Ops, Frontend Ops, Backend/API Ops, Data Ops, and the access, delivery, observability, and review owners whose services a Product Builder depends on.

What it is not

It is not a guided exercise in Claude Design or in coding one feature.

Placeholder. No client materials, no identifiable rooms or people.

What each capability puts in place

Same order as the horizontal row on The Principle, so the row you recognize there is the row you land on here.

CapabilityWorking assets for Product Builders
Design OpsReviewed patterns and components, interaction and state guidance, a design-review route, and a clear way to preserve the accepted design for implementation.
Frontend OpsAn approved, maintained starter repository or equivalent setup with a known version, owner, and clone-and-start instructions, plus conventions for structure, components, state, routing, accessibility, localization, testing, and integration.
Backend and API OpsReference patterns for authentication, permissions, migrations, and tests; discoverable API contracts with their business meaning; versioning, error conventions, test environments, and a route to request or build a missing API.
Data OpsClear definitions and event contracts, appropriate test data, access and quality rules, and a way to answer a concrete learning question.
Access and deliveryA named owner and response target for appropriately scoped access; protected branches, required checks, named environments, and proof of which revision is running.
Observability and reviewRead-only access to useful logs, errors, and integration health; a diagnostic and incident route; and a dependable technical review path with a named owner.

When something is missing

  1. The Product Builder sends a bounded request

    Context, constraints, a response target, and an acceptance check.

  2. The Ops owner decides

    Extend the shared service, or grant an exception.

  3. Both sides verify the result

    In the integrated product, not in the document.

How the training runs

Two days, 14 hours, in English or French, for up to eight participants from the Ops teams, with at least one Product Builder and a sponsor who can resolve ownership questions.

  1. Preparation

    A 60–90 minute call to choose one real Product Builder journey, gather the existing guidance, and identify the Ops owners who can decide during the workshop.

  2. Day 1 — see the work from the Product Builder's side

    Follow how a Product Builder would start that initiative, test whether each service is operational rather than only documented, and define the minimum service each team must offer.

  3. Day 2 — build the first enablement pack

    Each team drafts its first usable contribution, agrees how missing capabilities are requested and verified, and has a Product Builder walk through the pack and mark what is usable, unclear, or blocked.

  4. Follow-up review

    A 90-minute review two to three weeks later, to check whether a Product Builder could use the first assets on a real initiative.

What the group leaves with

A Product Builder enablement pack, version 0

  1. A map of the chosen journey and its current blockers.

  2. Named owners and a small catalog of the shared services that journey needs.

  3. Draft frontend and backend/API conventions, with the approved starter repository or a named plan to build one.

  4. An API and access map: what exists, who owns it, how to get scoped access, and what is missing.

  5. Design and data guidance where that journey needs it.

  6. A readiness check for required checks, deployable branches, environments, running-revision evidence, diagnostics, and technical review.

  7. A request-and-response contract between Product Builders and Ops owners, with response times, acceptance evidence, and escalation.

  8. A 30/60/90-day plan with accountable owners.

The free kit stays complete.

Nothing a Product Builder needs for a first run is reserved for the training.

The workshop produces an initial pack and a prioritized plan. Writing a full production convention set, building new APIs, provisioning access, and platform changes are further work by the responsible teams.